• © Goverland Inc. 2026
  • v1.0.1
  • Privacy Policy
  • Terms of Use
Aave DAOAave DAOby0xf71fc92e2949ccF6A5Fd369a0b402ba80Bc61E02bgdlabs.eth

Risk Stewards Phase 1: CapsPlusSteward

Voting ended almost 3 years agoSucceeded

Summary

Approve moving forward with the concept of Risk Stewards and their first iteration: CapsPlusRiskSteward, for risk providers to increase supply and borrow caps in an agile, but controlled way.

Context

An extended explanation of the initial idea of the system can be found HERE, together with the feedback on the community

Options

  1. 50% maximum increase limit, per asset, every 5 days
  2. 100% maximum increase limit, per asset, every 5 days
  3. Not approve, different parameters needed
  4. Abstain

Option 1 and 2 approve the initiative, with the first setting a maximum increase of 50% of the current value every 5 days, while the second proposes a more flexible approach with maximum 100% increase. Important to highlight that this is a maximum; risk providers will decide the exact value depending on their analysis.

Option 3 implies that the Risk Stewards exploration should continue, but with different initial configurations in the case of CapsPlusSteward.

Off-Chain Vote

YES 50% max increase per 5 days
1.54K AAVE0.3%
YES 100% max increase per 5 days
544.75K AAVE99.7%
NO, more discussion needed
239.58 AAVE0%
ABSTAIN
100.42 AAVE0%
Download mobile app to vote

Discussion

Aave DAORisk Stewards Phase 1: CapsPlusSteward

Timeline

Apr 11, 2023Proposal created
Apr 12, 2023Proposal vote started
Apr 17, 2023Proposal vote ended
Dec 25, 2025Proposal updated