• © Goverland Inc. 2026
  • v1.0.8
  • Privacy Policy
  • Terms of Use
gmdaogmdaoby0xd6f631C796a56A5d448Dd88a01f15058c4A0Be52makeitback.eth

GM 15.1 : gm.studio core dev.fund (4/23/22-6/1/22)

Voting ended almost 4 years agoSucceeded

Author:

Cyphr

Proposal date:

16 mai 2022

Summary:

6 week retainer to fund studio costs (4/23/22-6/1/22)

The funding period was increased to 6 weeks in order to be better aligned with our funding cycles, which will commence on the 1st of each month.

Specific goals for the next month (May):

  • Develop a collections page
  • Develop a gallery page
  • If possible: Integrate live render into the gallery page
  • Possible prep work for new drop/mechanics.
  • Misc smaller issues (see project page https://github.com/gmdaoeth/studio/issues)

Core team salaries

The funding for the team for the first 2 weeks will remain unchanged from previous period with a rate of Ξ0.0375/hour.

This work has already been completed.

Willyham: 30 hours = 1.125 ETH Bhish: 30 hours = 1.125 ETH cxkoda: 20 hours = 0.75 ETH

For the remaining 4 weeks, hours were adjusted to due to the reduced expected workload to:

Willyham: 10 hours/week = 40 hours = 1.5 ETH Bhish: 10 hours/week = 40 hours = 1.5 ETH cxkoda = 5 hours/week = 20 hours = 0.75 ETH

Additional operating costs : see the attached picture at the end.

Notes: Promo videos were a large expense which we were trialing for a single drop. Moving forward we would likely scale this back to 2 videos / drop.

Breakdown of costs :

  • Core team (salary based on the outlined hours at the rate of Ξ0.0375/hour): 6.75 ETH

  • Drop fund (crunch time around the drop): 1.5 ETH

  • Infra costs: $915.36 / 0.456 ETH

  • One-time costs (marketing & carbon offset for 2 drops): $4,078 / 2 ETH

  • Total request: 10.7 ETH, sent to the studio multisig: https://etherscan.io/address/0x16485319Aa0aD7a4E68176FBaadA235c92ACae2E

Sponsors:

Cyphr, willyham

Capture d’écran 2022-05-22 à 09.47.11.png

Off-Chain Vote

For
43 gmDAO97.7%
Against
0 gmDAO0%
Abstain
1 gmDAO2.3%
Quorum:110%
Download mobile app to vote

Discussion

gmdao GM 15.1 : gm.studio core dev.fund (4/23/22-6/1/22)

Timeline

May 22, 2022Proposal created
May 23, 2022Proposal vote started
May 25, 2022Proposal vote ended
Apr 23, 2025Proposal updated