• © Goverland Inc. 2026
  • v1.0.8
  • Privacy Policy
  • Terms of Use
ShapeShift IdeationShapeShift Ideationby0xBd88Dc007E729438CbF2368312aa0935172eF5050xBd88…F505

[Ideation] SCP-215 (Amendment): Engineering Workstream Contributor Addition, June 1 – September 30, 2026

Voting ended 24 days agoSucceeded

Status: Revised version of SCP-215 after community feedback.
Parent proposal: SCP-212 (Engineering Workstream Renewal: April 1, 2026 to September 30, 2026)
Supersedes: SCP-215 (abandoned following community feedback)

Abstract

This proposal adds discostu as a fractional contributor to the Engineering Workstream for four months (June 1, 2026 through September 30, 2026). Responsibilities cover BD, partner-facing product work, marketing and comms, and targeted engineering contributions with Kev.

FBL is stepping down from the Product Lite Workstream (SCP-210) at the end of May 2026. Discostu's existing BD scope under that workstream needs a new home. Rather than creating a separate workstream, this amendment places his work under Engineering. This keeps BD and partner velocity intact, supports the DAO's API revenue priority, and limits governance overhead.

Compensation is 100% FOX ($6,500/month). Zero USDC burn, preserving DAO runway.

This is a revised version of SCP-215 after community feedback: compensation reduced from $9,500/mo (USDC + FOX mix) to $6,500/mo (100% FOX), and scope trimmed (Telegram management removed, Roadmap prioritization downgraded to input, Linear management removed from scope).


Motivation

Main objective

  • Reduce the gap with competitors

  • Build long-term relationships with chains and projects approached

  • Work on continuous API/Widget improvement with Kev

  • Once enough chain contacts have been established and the API/Widget is fully polished, launch a coordinated marketing campaign promoting the API/Widget to builders, with chain partners actively amplifying the campaign across their channels for maximum reach

Why absorb into Engineering rather than create a separate workstream

  • This role requires close, ongoing collaboration with the Engineering team. Placing it under the Engineering Workstream simplifies that coordination.

  • Lean governance: one workstream, one budget, one contributor amendment, instead of creating multiple parallel proposals.

  • Continuity: avoids disruption to active integrations and communications with current partners (Bob, MegaEth, pait.fi, Brila, and others).


Specification

Team addition

  • discostu: Contributor (BD, light Product, Marketing/comms), reporting into the Engineering Workstream.

Scope: what discostu owns

Chain relations

  • Chain listings: getting ShapeShift listed on relevant chain ecosystems

  • Chain co-marketing: X posts, blog articles, LinkedIn posts coordinated with chain partners

  • Chain integration: getting ShapeShift featured on chain landing pages alongside other bridges

  • Chain analysis: providing the Engineering team with complete analyses of high-potential chains and their ecosystems
    Partner integration (API/Widget)

  • Continued outbound to projects for ShapeShift's API/Widget

  • Closing API partners and managing the BD pipeline

  • API partner onboarding: documentation, technical integration, and support, with Kev

  • Co-marketing management with projects integrating ShapeShift: X posts, blog articles, LinkedIn posts
    Product

  • Input on roadmap prioritization: providing competitive analysis and partner pipeline signal to inform Engineering's decisions on shipping order. Engineering retains decision authority.

  • API / Widget landing page redesign: improving conversion and lead quality, directly aligned with outbound BD.

  • Partner portal page: improving the partner portal to make registration and follow-up more intuitive for projects integrating ShapeShift.
    Engineering contribution

  • Competitive intelligence and targeted PR contribution: analyzing opportunities identified in research, and opening targeted PRs to help Kev close gaps with competitors.
    Operations

  • Custom automation tool: building and maintaining the Twitter/Telegram/Salesforce tool for partner follow-ups and lead tracking.

  • Marketing and comms: managing partner-facing comms (blog articles, Twitter/LinkedIn posts) and partner communication.

  • Cross-workstream coordination: async with Tokenomics, Operations, and other workstreams via DMs and writing.

  • Weekly written reports: continuation of existing cadence.

Scope: explicitly NOT covered

  • Hosting shapeshift.com and Railway migration: remains with Engineering core.

  • Public positioning (Spaces, podcasts): not within this scope.

  • Telegram management: not within this scope.


Coordination with Engineering

  • Reporting: discostu's weekly written reports continue, integrated with Engineering's existing cadence.

Period

June 1, 2026 – September 30, 2026 (4 months)


KPIs

Outbound and pipeline

  • Continued outbound to chains and projects throughout the period, focused on quality of relationships. Closes are subject to the API/Widget reaching a polished, sellable state.
    Chain relations

  • Secure ShapeShift listings on 80%+ of newly integrated chains

  • Deliver a co-marketing plan for each chain integration
    Product

  • Ship the API / Widget landing page redesign during the period

  • Weekly written reports delivered on the existing cadence


Budget

Compensation structure (discostu)

  • Monthly FOX: $6,500 (100% FOX)

  • 4-month total: $26,000

  • Zero USDC burn
    Note: Apotheosis's weekly hours under SCP-212 are increased from 6 to 8 hours/week to support discostu on calls and weekly check-ins. Monthly compensation goes from $2,688 to $3,583 USDC.

image.png

https://docs.google.com/spreadsheets/d/1vkx8ncUDW0sJIATWrujIc2_onCZR_Q5Yr69B5smkCAc/edit?usp=sharing

Benefits

  • Resources the API revenue path: drives outbound to chains and projects, owns the landing page redesign, and frees Kev to focus on technical readiness.

  • Keeps BD and partner velocity going through FBL's transition without a governance gap.

  • Tighter loop between BD/Marketing wins and Engineering shipping (less context-switching).

  • 100% FOX compensation: zero USDC burn, preserves DAO runway during austerity, aligns contributor incentives with DAO success.

  • Lean governance: one consolidated proposal instead of two parallel workstreams.

  • Continuity for active partner relationships already created (Katana, MegaEth, Starknet, BOB and in-flight API customers).

  • Discostu retains direct collaboration with Kev for technical work on competitive PRs.


Drawbacks

  • BD sales cycles are long. Partner deals (chain integrations, API customers) take months from initial contact to close.

  • Discostu is not a native English speaker. Some high-stakes partner calls may benefit from backup, which Apotheosis has offered to provide.


Vote

  • For: Approve the addition of discostu to the Engineering Workstream as a fractional contributor for the period June 1 to September 30, 2026, with the scope and compensation outlined above.

  • For with changes: Approve with the following modifications: {X, Y, Z}.

  • Against: Do not add discostu to the Engineering Workstream.

Off-Chain Vote

For
10.28M FOX59.9%
For with change
0 FOX0%
Against
6.88M FOX40.1%
Download mobile app to vote

Discussion

ShapeShift Ideation[Ideation] SCP-215 (Amendment): Engineering Workstream Contributor Addition, June 1 – September 30, 2026

Timeline

May 19, 2026Proposal created
May 19, 2026Proposal vote started
May 27, 2026Proposal vote ended
May 28, 2026Proposal updated