Title: [LIP67: Forge Working Group for S11] Authors: [Marcus] Date Created: [2024.12.04]
The mission of the Forge Group is to bring together experienced PMs to mine, discover, and polish great public ideas and public goods, to measure and evaluate the progress of working groups, and to drive and assist LXDAO projects and efforts forward to make LXDAO better.
The Forge group, as the main working group driving the project and internal community needs, in S10, the Forge group drove the iteration of the website, the FairSharing product upgrade, the Brutal Learning branding, the MyFirstWeb3 product relaunch and Brainstorming, the launch of the IntensiveCoLearning project, the refactoring of the Community Research Group, and also participated in the devcon 7 conference. Like Coordination day
The Forge team regularly reports on and promotes internal community projects on a weekly basis.
LXDAO Website: LXDAO has upgraded its branding, and LXDAO will create an infinite cycle of public goods.
CryptoDCA: The fixed investment project has completed its official launch
IntensiveCoLearning: Cruelty Together project has launched its branding and the project team has been formally established, the overall progress of Millstone 1: 80%.
PGNode: PGNode official website is online, L1 weekly newsletter is online.
FairSharing: Completed team restructuring, sorted out legacy issues and fixed the blocked Claim Pizza feature, redesigned the overall FS architecture, and pushed forward the iterative incentive pooling programme, which is now 60% complete.
MyFirstWeb3: Started 2 rounds of brainstorming sessions, identified the direction of lightweight + fun education format, and initiated community discussions.
OPCN: Daily operations, published over 12 weekly articles, S10 total over 20 articles published.
The Forge team has been regularly working on different ecosystems on a weekly basis to collate and advance their needs.
Optimism: Submitted FairShaing Grants application and LXDAO RetroPGF application, and got some feedback on the lack of professionalism.
Gitcion: Submitted GR22 Community Round and OSS Round rounds.
Arbitrum: Completed some Arb profiling.
Reorganised the Wild LX group, the Wild LX group has been working too much on translating content and too little on the research system and atmosphere, now it needs to focus more on the research on how Grants are distributed.
Some basic SOP mechanisms have been established, and regular dialogues have been held with fixed posts and intern posts to help sort out goals.
https://www.notion.so/lxdao/Forge-Working-Group-Sop-12cdceffe40b807ab64ec38b280ae30a
Focusing too much on external Grants applications and not researching the underlying mechanisms and needs of the project.
Multiple researchers are focusing on Optimism, Arbitrum, Gitcoin, and ignoring the direction that the community needs to move forward and do better. In S10, the Forge team needs to adjust its strategy, complete the community's internal projects, and emphasise and research the underlying mechanisms of collaboration, and at the same time, it should summarise and collate the external requirements every week, and initially update it in the form of a forum post. At the same time, external requirements should be summarised and collated weekly, and initially updated in the form of a forum post.
Some SOP and dialogue mechanisms have been established, but they have not been spread to the whole community, and there is no obvious mechanism to bring up the old and bring in the new. The main problems are: unclear sense of goal, insufficient initiative, and weak ability to test the Milestone.
The research on external needs is more often conducted by applying for Grants, but the exact research needs of the external ecosystem have not been better organised and analysed in a more systematic way.
In S11, we want to focus on iterating on the community's own products as well as research on the underlying collaboration mechanisms.
In S11, we will focus on the problems posed by coordination and systematically analyze specific issues.
In S11, we will set up 2 fixed-term members and 2 interns.
10,000 LXPU per month, 30,000 LXPU in total, 1 LXPU = 0.8 U + 0.2 LXP.
Forge workgroups are motivated by project management, internal requirements analysis and facilitation, external requirements acceptance and introduction, and project coordination.
| Role | Duty | Worktime | Amount | Wage | Budget | | --- | --- | --- | --- | --- | --- | | Project Manager | Organising weekly meetings, coordinating people, driving existing LXDAO requirements, supporting project development within LXDAO, ecology, project and PM incubation additions, LXDAO Program Promotion | 15~20h/Week | 1 | 30LXPU/h | 2000 | | Project Manager | Facilitate internal community projects, organise regular weekly project meetings, test project Milestone, external requirements gathering and facilitation. | 12~20h/Week | 1 | 20~30 XPU/h | 1500 | | Researcher (internship) | Demonstrated initiative to drive community affairs, product analysis and research skills | 15h/Week | 2 | 10LXPU/h | 1200 | | Designer | Support LXDAO internal and project design requirements | 16.25h/Week | 1 | 20LXPU/h | 1300 | | Research Bounty | Public Goods Product Sustainability Analysis, Grant Analysis, Collaborative Mechanisms Analysis | 20h/Week | | 15LXPU/h | 1500 | | Other Bounty | LXDAO Internal Requirements Development, Project Requirements Development, Project Server Costs, Project Coordination, etc. | 35h/Week | | 15LXPU/h | 2500 |
Forge Group 的使命是汇集经验丰富的 PM,挖掘、发现和打磨伟大的公共理念和公共产品,衡量和评估工作组的进展,并推动和协助 LXDAO 项目和努力向前发展,使 LXDAO 更好地发挥作用。
Forge 小组作为主要推动项目和社区内部需求的工作组,在 S10 中,Forge 小组推动了官网迭代,FairSharing 产品升级,残酷共学品牌的建立,MyFirstWeb3 产品重启和脑暴,定投项目的上线,社区研究小组的重构,同时也参与了 devcon 7 Coordination day
Forge 小组每周会定期对各个社区内部项目进行周报汇总和推动项目
LXDAO Website: LXDAO 进行了品牌升级,LXDAO 将打造公共物品的无限循环
CryptoDCA: 定投项目完成了正式上线
残酷共学:残酷共学项目启动了品牌化,项目组正式成立,目前 Millstone 1 整体进度:80%
PGNode:PGNode 官网上线,L1 周刊上线
FairSharing: 完成团队重组,梳理遗留问题,并修复其中阻塞使用的 Claim Pizza 功能, FS 整体架构重新设计,并主要推进激励池迭代方案,该方案目前完成 60%
MyFirstWeb3: 启动了 2 轮脑暴会议,确定了方向为轻量化+趣味化的教育形式,并发起了社区讨论
OPCN: 日常运营,发布超过 12 篇周刊,S10 总计发布超过 20 篇文章
Forge 小组每周会定期对不同的生态开展需求整理和推进
Optimism: 提交了 FairShaing Grants 申请和 LXDAO RetroPGF 申请,获得一些专业度不够的反馈
Gitcion: 提交了 GR22 Community Round 和 OSS Round 轮次
Arbitrum: 完成了一些 Arb 资料整理
重构了野生 LX 小组,野生 LX 小组在以往的工作过多在于翻译内容上,研究的体系和氛围比较少,目前需要将更多的内容放在对于 Grants 分配方式的研究上
建立了一些基本的 SOP 机制,和固定岗和实习岗定期举行一些对话,帮助梳理目标
https://www.notion.so/lxdao/Forge-Working-Group-Sop-12cdceffe40b807ab64ec38b280ae30a
将过多的精力放在了外部的 Grants 申请上,而缺少了对一些底层机制和项目需求的研究
多个研究员将注意力分布在 Optimism,Arbitrum, Gitcoin 上,而忽略了社区本身需前进和做好的方向,在 S10 中,Forge 小组需调整战略,完成社区内部的项目推进,强调和研究协作的底层机制,同时,应每周对外部需求进行汇总整理,初步以论坛帖子的形式发布在论坛进行更新
建立了一些 SOP 机制和对话机制,但是并未扩散到整个社区,也并未形成明显的老带新的机制,主要问题在于:目标感并不清晰,主动性不够强,Milestone 检验能力弱
外部需求的研究更多推进是以申请 Grants 的方式去进行,而并未更好的整理到外部生态的确切研究需求,也并未对需求进行更系统性的分析
在 S11 中,我们希望把重点放在社区内部本身产品的迭代以及底层协作机制的研究上
在 S11 中,我们将重点关注协调所带来的问题以及对具体问题进行系统性分析
在 S10,我们将设立 2 名 固定岗成员 和 2 名 实习成员
每月 10000 LXPU,总计 30000 LXPU,1 LXPU=0.8 U+0.2 LXP
Forge 工作组的激励范围包括:项目管理,内部需求分析和推动,外部需求接受和引入,项目协调等 | Role | Duty | Worktime | Amount | Wage | Budget | | --- | --- | --- | --- | --- | --- | | Project Manager | 组织周会,协调人员,推动 LXDAO 现有需求,支持 LXDAO 内部项目发展,生态,项目及 PM 孵化新增, LXDAO 项目推进 | 15~20h/Week | 1 | 30LXPU/h | 2000 | | Project Manager | 推动社区内部项目,定期组织项目周会,检验项目 Milestone,外部需求收集和推动 | 12~20h/Week | 1 | 20~30 XPU/h | 1500 | | Researcher (internship) | 具有推动社区事务主动性,产品分析能力和研究能力 | 15h/Week | 2 | 10LXPU/h | 1200 | | Designer | 支持 LXDAO 内部和项目设计需求 | 16.25h/Week | 1 | 20LXPU/h | 1300 | | 研究 Bounty | 公共物品产品可持续性分析,Grant 分析,协作机制分析 | 20h/Week | | 15LXPU/h | 1500 | | 其他 Bounty | LXDAO 内部需求开发,项目需求开发,项目服务器成本,项目协调等 | 35h/Week | | 15LXPU/h | 2500 |