Requesting Organization: Roko Network Corp
Grant Amount: $65,000 equivalent in TAO
Proposal Date: September 2025
Executive Summary
This proposal seeks approval for a $65,000 equivalent allocation in TAO from the Roko Network Foundation’s cold storage root staking wallet to Roko Network Corp. The funds will sustain ecosystem development, ensuring Layer 1 (L1) engineering continuity, ecosystem infrastructure, and hardware-level validation for fair and transparent computation measurement.
The Development Report and Future Roadmap highlights that Roko’s temporal architecture is now production-ready at the transaction and block level. The next phase focuses on advancing consensus, hardware-secured time attestations, validator sampling, wallet integration, and security modeling. This budget ensures the L1 team can deliver those critical milestones while maintaining operational momentum.
Allocation Summary
Total Allocation Requested: $65,000 equivalent in TAO
TAO Valuation: $340 (assumed for budget translation)
Total TAO Allocated: ~192 TAO
Breakdown:
- Core L1 Team Development: $60,000 (~177 TAO)
- Website Redesign: $2,500 (~7 TAO)
- Power Audit (A100 Server): $2,500 (~7 TAO)
Funding Breakdown
1. Core L1 Team Development — $60,000 (~177 TAO)
The $60k allocation will support four months of engineering dedicated to advancing Roko’s Layer 1, specifically around temporal consensus, runtime stability, hardware integration, and security.
Planned Goals & Deliverables (Month 1–4):
-
Month 1 — Hardware Attestation Prototype
- Integrate Zymbit hardware (HSM/timecard) for tamper-resistant proof-of-time.
- Define attestation format (certificate chain, hardware quotes, nonce binding).
- Implement runtime verifier to handle hardware-backed attestations .
-
Month 2 — Consensus & Timecard Quorum
- Introduce validator-level P2P gossip for timecard attestations.
- Implement validator sampling and aggregation to form per-slot time quorums.
- Wire quorum output into block production (pre-digest/inherent) to guarantee time correctness under consensus .
-
Month 3 — Miner Proof-of-Time (PoT)
- Activate block-level PoT, requiring block authors to include valid hardware attestations.
- Establish a certification authority (CA) phase to bootstrap trusted hardware participation.
- Begin limited rollout of PoT enforcement in testnet environments .
-
Month 4 — Wallet & Security Layer
- Deliver Roko Wallet alpha with TimeRPC client, hardware-backed signing, and preflight verification UX .
- Conduct security reviews and threat modeling (clock drift, key compromise, CA trust).
- Define slashing, fallback modes, and monitoring for validator integrity.
- Prepare mainnet readiness criteria and economic analysis .
Impact:
This funding ensures Roko Network can move from a working devnet prototype to a fully validated and consensus-integrated L1 with hardware-secured time attestations. The central outcome is L1 readiness for mainnet, with stronger guarantees of temporal correctness and operational reliability.
2. Website Redesign — $2,500 (~7 TAO)
Funding a research-led redesign of roko.network to present a clear, modern, and adaptable knowledge hub that communicates Roko’s mission, technical progress, and ecosystem resources.
3. Power Audit of A100 Server — $2,500 (~7 TAO)
An internal audit of Roko’s NVIDIA A100 development platform, using Timebeat and facility-grade telemetry, will:
- Capture high-precision, time-stamped measurements of compute, GPU utilization, and energy draw.
- Evaluate compute cycles at the smallest measurable unit.
- Feed proofs into the L1 for accurate tokenization of computation resources, ensuring fairness and transparency for node runners .
Execution & Oversight
- TAO Source: Foundation cold storage root staking wallet.
- Disbursement: Converted to USDC as required.
- Unused TAO: Retained by Roko Network Corp, restricted to approved scope.
- Monitoring: Weekly progress reports aligned with dev milestones.
Voting Options
- Yes: Approve the allocation of $65,000 equivalent in TAO from the Foundation’s root staking wallet to Roko Network Corp for ecosystem development and infrastructure initiatives as outlined.
- No: Do not approve this proposal.