This proposal is to confirm Core Contributor incentives for the 3-month period starting November 18.
The only change is reducing the Confirmation period from 6 months to 3 months. Reasoning for the change is to allow more flexibility for the Yak Treasury to change Contributor incentives if market conditions were to shift dramatically.
Eric Sulli (Treasury): 2.5 YAK Responsible for Treasury management and reporting.
Simon (Solidity Engineer): 25 YAK Lead Smart Contract Engineer.
Harry.avax (Content + Developer): 25 YAK Front-end development.
Ravageur77 (Marketing): 25 YAK Marketing, BD, operations.
Angus (Analytics + Developer): 25 YAK Data & analytics.